19:45 23 Nov 24
Project
0187 :
Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
---|---|
Reference number | 0187 |
Title |
Project: Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant |
Host Party(ies) |
Ukraine
(project participant: no) Approval (2525 KB) Authorised project participants: LLC "ISTEK" Authorizations: Authorisation (2525 KB) Authorisation included in the written approval |
Other Party(ies) involved |
Netherlands
(project participant: no) Approval (538 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation (538 KB) Authorisation included in the written approval |
Scale | Large |
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) 4: Manufacturing industries |
PDD(s) |
PDD (844 KB)
Supporting documentation: Investment Analysis (215 KB) Calculation of Emission Reductions (59 KB) |
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
Determination report |
Determination report (200 KB) Relevant documents: Determination Report ISTEK (1369 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
58,316 t CO2 equivalent |
Fee | 10,163.20 USD |
Period for requesting review | 15 May 10 - 28 Jun 10 (17:00 GMT) |
Crediting period | 01 Jan 10 - 31 Dec 12 |
Project design document / determination |
Publication of the project design document Introduction of a 12.5MWe CHP with a coke plant's flue gases utilization at the branch of ISTEK LLC "Horlivka Coke Plant" |
Connect with JI: