Project 0187 : Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0187
Title Project:
Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
Host Party(ies) Ukraine (project participant: no)
Approval (2525 KB)

Authorised project participants:
LLC "ISTEK"

Authorizations:
Authorisation (2525 KB)
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (538 KB)

Authorised project participants:
Global Carbon BV

Authorizations:
Authorisation (538 KB)
Authorisation included in the written approval
Scale Large
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)
4: Manufacturing industries
PDD(s) PDD (844 KB)

Supporting documentation:
Investment Analysis (215 KB)
Calculation of Emission Reductions (59 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (200 KB)

Relevant documents:

Determination Report ISTEK (1369 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
58,316 t CO2 equivalent
Fee 10,163.20 USD
Period for requesting review 15 May 10 - 28 Jun 10 (17:00 GMT)
Crediting period 01 Jan 10 - 31 Dec 12
Project design document / determination Publication of the project design document
Introduction of a 12.5MWe CHP with a coke plant's flue gases utilization at the branch of ISTEK LLC "Horlivka Coke Plant"