09:12 31 Oct 25
			
	
      			
			      Project
      0187      :
      Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant
    
					| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0187 | 
| Title | Project: Introduction of a 12,5MWe CHP with a coke plant’s flue gases utilization at the branch of ISTEK LLC “Horlivka Coke Plant | 
| Host Party(ies) | Ukraine
                    
                    (project participant: no)  Approval (2525 KB) Authorised project participants: LLC "ISTEK" Authorizations:  Authorisation (2525 KB) Authorisation included in the written approval | 
| Other Party(ies) involved | Netherlands
                    
                    (project participant: no)  Approval (538 KB) Authorised project participants: Global Carbon BV Authorizations:  Authorisation (538 KB) Authorisation included in the written approval | 
| Scale | Large | 
| Project category | Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) 4: Manufacturing industries | 
| PDD(s) |  PDD (844 KB) Supporting documentation:  Investment Analysis (215 KB)  Calculation of Emission Reductions (59 KB) | 
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS | 
| Determination report |  Determination report (200 KB) Relevant documents:  Determination Report ISTEK (1369 KB) | 
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) | 58,316 t CO2 equivalent | 
| Fee | 10,163.20 USD | 
| Period for requesting review | 15 May 10 - 28 Jun 10 (17:00 GMT) | 
| Crediting period | 01 Jan 10 - 31 Dec 12 | 
| Project design document / determination | Publication of the project design document Introduction of a 12.5MWe CHP with a coke plant's flue gases utilization at the branch of ISTEK LLC "Horlivka Coke Plant" | 

Connect with JI: