0231: Implementation of energy efficient measures at "Donetsksteel"
 
Reference number 0231
Title Project:
Implementation of energy efficient measures at "Donetsksteel"
Host Party(ies) Ukraine
Scale Large
Project category Sectoral scope(s):
4: Manufacturing industries
9: Metal production
Crediting period 01 Jan 08 - 31 Dec 12
Verification report Monitoring report/verification number: 001

Monitoring period:
01 Jan 08 - 31 Oct 11

AIE that performed the verification:
Bureau Veritas Certification Holding SAS

Revised monitoring plan(s):*
Revised monitoring plan (603 KB)

Determination regarding the revisions to the monitoring plan(s):
Determination (722 KB)

Monitoring report(s): Supporting documentation:
Monitoring report (603 KB) Calculation of Emission Reductions (210 KB)

Verification report(s): Other relevant documents:
Verification report (182 KB) Verification Report (783 KB)

Verified emission reductions/enhancements of removals:
1,369,211 tonnes CO2 equivalent

Period for requesting review:
06 Mar 12 - 20 Mar 12 (17:00 GMT)


* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."

(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)