Project 0064 : Nitrous Oxide Emission Reduction Project at GP Nitric Acid Plant in AB Achema Fertiliser Factory
 
Reference number 0064
Title Project:
Nitrous Oxide Emission Reduction Project at GP Nitric Acid Plant in AB Achema Fertiliser Factory**

Host Party(ies) Lithuania (project participant: no)
Approval (56 KB)

Authorised project participants:
AB Achema

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)*
Approval (364 KB)

Authorised project participants:
ECOCOM BG Ltd.*

Authorizations:
Authorisation included in the written approval*
Modalities of communication Modalities of communication (946 KB)
Scale Large
Project category Sectoral scope(s):
5: Chemical industry
PDD(s) PDD (527 KB)
(A)IE chosen by the project participants for determination TÜV SÜD Industrie Service GmbH
Determination report Determination report (49 KB)

Relevant documents:

Final revised Determination Report (328 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
563,562 t CO2 equivalent
Fee 111,212.40 USD
Period for requesting review 30 May 09 - 13 Jul 09 (17:00 GMT)
Crediting period 16 Aug 08 - 31 Dec 12
Project design document / determination
(history)
Publication of the project design document
Publication of the determination report
Monitoring / verification Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 103,241 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 560,081 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 927,598 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 701,550 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification

* Amended after final determination regarding the project design document in accordance with the relevant provisions.

** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.