Project 0001 : Switch from wet-to-dry process at Podilsky Cement, Ukraine
 
Reference number 0001
Title Project:
Switch from wet-to-dry process at Podilsky Cement, Ukraine**

Host Party(ies) Ukraine (project participant: no)
Approval (1541 KB)

Authorised project participants:
JSC Podilsky Cement

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Ireland (project participant: no)
Approval (514 KB)

Authorised project participants:
CRH Finance Limited

Authorizations:
Authorisation included in the written approval
Modalities of communication* Modalities of communication (1296 KB)*
Scale Large
Project category Sectoral scope(s):
4: Manufacturing industries
PDD(s) PDD (1650 KB)

Revisions to the monitoring plan:*
18 Sep 12 Monitoring plan (288 KB)
Determination (404 KB)
(A)IE chosen by the project participants for determination TÜV SÜD Industrie Service GmbH
Determination report Determination report (86 KB)

Relevant documents:

Determination Report (630 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
755,851 t CO2 equivalent
Fee 149,670.20 USD
Period for requesting review 10 Feb 07 - 26 Mar 07 (17:00 GMT)
Crediting period 01 Jan 09 - 31 Dec 12
Project design document / determination
(history)
Publication of the project design document
Publication of the determination report
Monitoring / verification Monitoring report/verification number: 002
Verified emission reductions/enhancements of removals: 396,040 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 108,915 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification

* Amended after final determination regarding the project design document in accordance with the relevant provisions.

** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.