16:46 23 Nov 24
Project
0001 :
Switch from wet-to-dry process at Podilsky Cement, Ukraine
Reference number | 0001 | |||
---|---|---|---|---|
Title |
Project: Switch from wet-to-dry process at Podilsky Cement, Ukraine** |
|||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (1541 KB) Authorised project participants: JSC Podilsky Cement Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Ireland
(project participant: no)
Approval (514 KB) Authorised project participants: CRH Finance Limited Authorizations: Authorisation included in the written approval |
|||
Modalities of communication* | Modalities of communication (1296 KB)* | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 4: Manufacturing industries |
|||
PDD(s) |
PDD (1650 KB)
Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | TÜV SÜD Industrie Service GmbH | |||
Determination report |
Determination report (86 KB) Relevant documents: Determination Report (630 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
755,851 t CO2 equivalent | |||
Fee | 149,670.20 USD | |||
Period for requesting review | 10 Feb 07 - 26 Mar 07 (17:00 GMT) | |||
Crediting period | 01 Jan 09 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 002
Verified emission reductions/enhancements of removals: 396,040 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 108,915 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: