12:34 24 Oct 25
0001:
Switch from wet-to-dry process at Podilsky Cement, Ukraine
| Reference number | 0001 | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Title |
Project:
Switch from wet-to-dry process at Podilsky Cement, Ukraine |
||||||||||
| Host Party(ies) | Ukraine | ||||||||||
| Scale | Large | ||||||||||
| Project category |
Sectoral scope(s): 4: Manufacturing industries |
||||||||||
| Crediting period | 01 Jan 09 - 31 Dec 12 | ||||||||||
| Verification report |
Monitoring report/verification number: 001
Monitoring period: 01 Oct 11 - 31 Dec 11 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Determination regarding the revisions to the monitoring plan(s): Determination (404 KB)
Verified emission reductions/enhancements of removals: 108,915 tonnes CO2 equivalent Period for requesting review: 22 Sep 12 - 06 Oct 12 (17:00 GMT) |
* According to paragraph 37 of the
Guidance on criteria for baseline setting and monitoring
the "project participants are encouraged to
improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness
of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of
the
JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness
of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment
of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the
JI guidelines."(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)

Revised monitoring plan
Calculation of Emission Reductions
Connect with JI: