02:53 20 Nov 25
Project
0178 :
Liepynes Wind Power Park Joint Implementation Project
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0178 |
| Title |
Project: Liepynes Wind Power Park Joint Implementation Project |
| Host Party(ies) |
Lithuania
(project participant: no) Approval (1960 KB)Authorised project participants: Vejo gusis, UAB Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Netherlands
(project participant: no) Approval (567 KB)Authorised project participants: Ecocom BG, LTD Authorizations: Authorisation included in the written approval |
| Scale | Small |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
| PDD(s) |
PDD (439 KB)
|
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
| Determination report |
Determination report (48 KB)Relevant documents: Liepyne Determination Report (767 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
11,646 t CO2 equivalent |
| Fee | 0.00 USD |
| Period for requesting review | 16 Jun 10 - 30 Jul 10 (17:00 GMT) |
| Crediting period | 01 Nov 09 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Liepynes Wind Power Park Joint Implementation Project |

Approval
Connect with JI: