Project 0178 : Liepynes Wind Power Park Joint Implementation Project
 
Reference number 0178
Title Project:
Liepynes Wind Power Park Joint Implementation Project**

Host Party(ies) Lithuania (project participant: no)
Approval (1960 KB)

Authorised project participants:
Vejo gusis, UAB

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (567 KB)

Authorised project participants:
Ecocom BG, LTD

Authorizations:
Authorisation included in the written approval
Modalities of communication Modalities of communication (476 KB)
Scale Small
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)

SSC type(s) and category(ies):

I.D. : Grid connected renewable electricity generation
PDD(s) PDD (439 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (48 KB)

Relevant documents:

Liepyne Determination Report (767 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
11,646 t CO2 equivalent
Fee 0.00 USD
Period for requesting review 16 Jun 10 - 30 Jul 10 (17:00 GMT)
Crediting period 01 Nov 09 - 31 Dec 12
Project design document / determination
(history)
Publication of the project design document
Publication of the determination report
Monitoring / verification Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 11,737 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 17,345 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 13,039 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification

** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.