14:09 31 Oct 25
			
	
      			
			
      0163:
      Kreivenai wind power park
    
					| Reference number | 0163 | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Title | Project: Kreivenai wind power park | ||||||||
| Host Party(ies) | Lithuania | ||||||||
| Scale | Large | ||||||||
| Project category | Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) | ||||||||
| Crediting period | 01 Jul 09 - 31 Dec 12 | ||||||||
| Verification report | Monitoring report/verification number: 001 Monitoring period: 01 Jul 09 - 31 Dec 10 AIE that performed the verification: Bureau Veritas Certification Holding SAS 
 Determination regarding the revisions to the monitoring plan(s):  Determination (269 KB) 
 
 Verified emission reductions/enhancements of removals: 41,993 tonnes CO2 equivalent Period for requesting review: 29 Mar 11 - 12 Apr 11 (17:00 GMT) | 
* According to paragraph 37 of the
 Guidance on criteria for baseline setting and monitoring
        the "project participants are encouraged to
        improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness
        of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of
        the
 Guidance on criteria for baseline setting and monitoring
        the "project participants are encouraged to
        improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness
        of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of
        the  JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness
        of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment
        of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the
JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness
        of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment
        of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the  JI guidelines."
JI guidelines."(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)

Connect with JI: