0163: Kreivenai wind power park
 
Reference number 0163
Title Project:
Kreivenai wind power park
Host Party(ies) Lithuania
Scale Large
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)
Crediting period 01 Jul 09 - 31 Dec 12
Verification report Monitoring report/verification number: 001

Monitoring period:
01 Jul 09 - 31 Dec 10

AIE that performed the verification:
Bureau Veritas Certification Holding SAS

Revised monitoring plan(s):*
Revised monitoring plan (667 KB)

Determination regarding the revisions to the monitoring plan(s):
Determination (269 KB)

Monitoring report(s):
Monitoring report (667 KB)

Verification report(s): Other relevant documents:
Verification report (76 KB) KREIVENAI WPP_1st Verification Report (269 KB)

Verified emission reductions/enhancements of removals:
41,993 tonnes CO2 equivalent

Period for requesting review:
29 Mar 11 - 12 Apr 11 (17:00 GMT)


* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."

(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)