0263: Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project
 
Reference number 0263
Title Project:
Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project*
Host Party(ies) Lithuania
Scale Small
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)

SSC type(s) and category(ies):

I.D. : Grid connected renewable electricity generation
Crediting period 01 Sep 11 - 31 Dec 12
Verification report Monitoring report/verification number: 001

Monitoring period:
13 Sep 11 - 30 Sep 12

AIE that performed the verification:
Bureau Veritas Certification Holding SAS

Monitoring report(s):
Monitoring report (509 KB)

Verification report(s): Other relevant documents:
Verification report (190 KB) Buciai Kadariai wind power park_1st verification REPORT_2012.10.23 (440 KB)

Verified emission reductions/enhancements of removals:
25,341 tonnes CO2 equivalent

Period for requesting review:
05 Dec 12 - 19 Dec 12 (17:00 GMT)


* Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.