Project 0263 : Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project
 
Reference number 0263
Title Project:
Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project**

Host Party(ies) Lithuania (project participant: no)
Approval (1073 KB)

Authorised project participants:
UAB Vejo Elektra (withdrawn)*
UAB Lariteksas (withdrawn)*
UAB Silales vejo elektra*

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)*
Approval (88 KB)

Authorised project participants:
Stichting Carbon Finance (SCF)

Authorizations:
Authorisation included in the written approval*
Modalities of communication Modalities of communication (627 KB)*
Scale Small
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)

SSC type(s) and category(ies):

I.D. : Grid connected renewable electricity generation
PDD(s) PDD (774 KB)

Supporting documentation:
Silale sensitivity_sept2011 (80 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (108 KB)

Relevant documents:

SILALE_JI_DETERMINATION REPORT_2012.05.04 (578 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
22,509 t CO2 equivalent
Fee 0.00 USD
Period for requesting review 30 May 12 - 13 Jul 12 (17:00 GMT)
Crediting period 01 Sep 11 - 31 Dec 12
Project design document / determination
(history)
Publication of the project design document
Publication of the determination report
Monitoring / verification Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 6,317 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 25,341 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification

* Amended after final determination regarding the project design document in accordance with the relevant provisions.

** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.