0263: Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project
 
Reference number 0263
Title Project:
Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project*
Host Party(ies) Lithuania
Scale Small
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)

SSC type(s) and category(ies):

I.D. : Grid connected renewable electricity generation
Crediting period 01 Sep 11 - 31 Dec 12
Verification report Monitoring report/verification number: 002

Monitoring period:
01 Oct 12 - 31 Dec 12

AIE that performed the verification:
Bureau Veritas Certification Holding SAS

Monitoring report(s):
Monitoring report (447 KB)

Verification report(s): Other relevant documents:
Verification report (187 KB) BUCIAI KADARIAI_2nd VERIFICATION REPORT_2013.03.07 (433 KB)
Monitoring data Buciai-Kadariai 2012 (35 KB)
Request_Silales vejo elektra (576 KB)
Request_Vejo elektra (544 KB)
Letter of modalities (627 KB)

Verified emission reductions/enhancements of removals:
6,317 tonnes CO2 equivalent

Period for requesting review:
16 Apr 13 - 30 Apr 13 (17:00 GMT)


* Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.