19:57 17 Nov 25
Project
0263 :
Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0263 |
| Title |
Project: Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project |
| Host Party(ies) |
Lithuania
(project participant: no) Approval (1073 KB)Authorised project participants: UAB Vejo Elektra UAB Lariteksas Authorizations: Authorisation included in the written approval Netherlands (project participant: no) Approval (88 KB)Authorised project participants: Stichting Carbon Finance (SCF) Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved | |
| Scale | Small |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
| PDD(s) |
PDD (774 KB)
Supporting documentation: Silale sensitivity_sept2011 (80 KB) |
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
| Determination report |
Determination report (108 KB)Relevant documents: SILALE_JI_DETERMINATION REPORT_2012.05.04 (578 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
22,509 t CO2 equivalent |
| Fee | 0.00 USD |
| Period for requesting review | 30 May 12 - 13 Jul 12 (17:00 GMT) |
| Crediting period | 01 Sep 11 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project |

Approval
Connect with JI: