Project 0263 : Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0263
Title Project:
Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project
Host Party(ies) Lithuania (project participant: no)
Approval (1073 KB)

Authorised project participants:
UAB Vejo Elektra
UAB Lariteksas

Authorizations:
Authorisation included in the written approval
Netherlands (project participant: no)
Approval (88 KB)

Authorised project participants:
Stichting Carbon Finance (SCF)

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved
Scale Small
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)

SSC type(s) and category(ies):

I.D. : Grid connected renewable electricity generation
PDD(s) PDD (774 KB)

Supporting documentation:
Silale sensitivity_sept2011 (80 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (108 KB)

Relevant documents:

SILALE_JI_DETERMINATION REPORT_2012.05.04 (578 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
22,509 t CO2 equivalent
Fee 0.00 USD
Period for requesting review 30 May 12 - 13 Jul 12 (17:00 GMT)
Crediting period 01 Sep 11 - 31 Dec 12
Project design document / determination Publication of the project design document
Wind Power Farm in Buciai and Kadariai Villages Joint Implementation Project