08:10 26 Apr 24
0200:
Griezpelkiu wind power park project
Reference number | 0200 | ||||||
---|---|---|---|---|---|---|---|
Title |
Project:
Griezpelkiu wind power park project* |
||||||
Host Party(ies) | Lithuania | ||||||
Scale | Small | ||||||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
||||||
Crediting period | 01 Oct 10 - 31 Dec 12 | ||||||
Verification report |
Monitoring report/verification number: 002
Monitoring period: 01 Jan 12 - 31 Oct 12 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Verified emission reductions/enhancements of removals: 13,876 tonnes CO2 equivalent Period for requesting review: 22 Dec 12 - 05 Jan 13 (17:00 GMT) |
* Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: