17:11 23 Nov 24
Project
0200 :
Griezpelkiu wind power park project
Reference number | 0200 |
---|---|
Title |
Project: Griezpelkiu wind power park project** |
Host Party(ies) |
Lithuania
(project participant: no)
Approval (1297 KB) Authorised project participants: Vejo gusis, UAB Authorizations: Authorisation included in the written approval |
Other Party(ies) involved |
Netherlands
(project participant: no)*
Approval (366 KB) Authorised project participants: Ecocom BG, LTD* Authorizations: Authorisation included in the written approval* |
Modalities of communication | Modalities of communication (261 KB) |
Scale | Small |
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
PDD(s) |
PDD (750 KB)
Supporting documentation: Fin model (431 KB) |
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
Determination report |
Determination report (52 KB) Relevant documents: Determination Report (758 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
19,855 t CO2 equivalent |
Fee | 0.00 USD |
Period for requesting review | 01 Oct 10 - 14 Nov 10 (17:00 GMT) |
Crediting period | 01 Oct 10 - 31 Dec 12 |
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
Monitoring / verification |
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 13,876 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 17,978 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: