09:56 18 Nov 25
Project
0200 :
Griezpelkiu wind power park project
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0200 |
| Title |
Project: Griezpelkiu wind power park project |
| Host Party(ies) |
Lithuania
(project participant: no) Approval (1297 KB)Authorised project participants: Vejo gusis, UAB Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved | |
| Scale | Small |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
| PDD(s) |
PDD (750 KB)
Supporting documentation: Fin model (431 KB) |
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
| Determination report |
Determination report (52 KB)Relevant documents: Determination Report (758 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
19,855 t CO2 equivalent |
| Fee | 0.00 USD |
| Period for requesting review | 01 Oct 10 - 14 Nov 10 (17:00 GMT) |
| Crediting period | 01 Oct 10 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Griezpelkiu wind power park project |

Approval
Connect with JI: