0105: CMM utilisation on the Joint Stock Company "Coal Company Krasnoarmeyskaya Zapadnaya No 1 Mine"
 
Reference number 0105
Title Project:
CMM utilisation on the Joint Stock Company "Coal Company Krasnoarmeyskaya Zapadnaya No 1 Mine"*
Host Party(ies) Ukraine
Scale Large
Project category Sectoral scope(s):
10: Fugitive emissions from fuels (solid, oil and gas)
8: Mining/mineral production
Crediting period 01 Jan 08 - 31 Dec 12
Verification report Monitoring report/verification number: 005

Monitoring period:
01 May 12 - 31 Dec 12

AIE that performed the verification:
Bureau Veritas Certification Holding SAS

Revised monitoring plan(s):**
Revised monitoring plan (1378 KB)

Determination regarding the revisions to the monitoring plan(s):
Determination (371 KB)

Monitoring report(s): Supporting documentation:
Monitoring report (1378 KB) Emission reductions (80 KB)

Verification report(s): Other relevant documents:
Verification report (43 KB) Verification report (371 KB)

Verified emission reductions/enhancements of removals:
235,612 tonnes CO2 equivalent

Period for requesting review:
19 Jun 13 - 03 Jul 13 (17:00 GMT)


* Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.

** According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."

(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)