Sudenai and Lendimai Wind Power Joint Implementation Project
Reference number | 0046 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Title |
Project:
Sudenai and Lendimai Wind Power Joint Implementation Project |
||||||||||
Host Party(ies) | Lithuania | ||||||||||
Scale | Small | ||||||||||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
||||||||||
Crediting period | 01 Sep 08 - 31 Dec 12 | ||||||||||
Verification report |
Monitoring report/verification number: 002
Monitoring period: 01 Jan 10 - 31 Dec 10 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Determination regarding the revisions to the monitoring plan(s): Determination (289 KB)
Verified emission reductions/enhancements of removals: 16,779 tonnes CO2 equivalent Period for requesting review: 26 Jul 11 - 09 Aug 11 (17:00 GMT) |
* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."