Project
0046 :
Sudenai and Lendimai Wind Power Joint Implementation Project
Reference number | 0046 | |||
---|---|---|---|---|
Title |
Project: Sudenai and Lendimai Wind Power Joint Implementation Project** |
|||
Host Party(ies) |
Lithuania
(project participant: no)
Approval (54 KB) Authorised project participants: Vejo Elektra UAB (withdrawn)* Sudenu vejo elektra UAB* Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Sweden
(project participant: no)
Approval (397 KB) Authorised project participants: Nordic Environment Finance Corporation (NEFCO) in its capacity as Fund Manager to the Baltic Sea Region Testing Ground Facility (TGF) Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (1048 KB)* | |||
Scale | Small | |||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
|||
PDD(s) |
PDD (878 KB)
Supporting documentation: Enclosure 1 - Sensitivity Analysis 0046 (205 KB) Enclosure 2 - Energy yield assessment 0046 (1552 KB) Enclosure 3 - Letter by 4Energia 0046 (357 KB) Enclosure 4 - Sudenai-Lendimai financial projection (165 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | TÜV SÜD Industrie Service GmbH | |||
Determination report |
Determination report (96 KB) Relevant documents: Determination Report (686 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
18,233 t CO2 equivalent | |||
Fee | 0.00 USD | |||
Period for requesting review | 30 Jun 09 - 13 Aug 09 (17:00 GMT) | |||
Crediting period | 01 Sep 08 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 005**
Verified emission reductions/enhancements of removals: 5,032 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 13,293 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 20,369 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 16,779 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 18,562 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.