0046 :
Sudenai and Lendimai Wind Power Joint Implementation Project
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0046 |
| Title |
Project: Sudenai and Lendimai Wind Power Joint Implementation Project |
| Host Party(ies) |
Lithuania
(project participant: no) Approval (54 KB)Authorised project participants: Vejo Elektra UAB Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Sweden
(project participant: no) Approval (397 KB)Authorised project participants: Nordic Environment Finance Corporation (NEFCO) in its capacity as Fund Manager to the Baltic Sea Region Testing Ground Facility (TGF) Authorizations: Authorisation included in the written approval |
| Scale | Small |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
| PDD(s) |
PDD (878 KB)
Supporting documentation: Enclosure 1 - Sensitivity Analysis 0046 (205 KB)
Enclosure 2 - Energy yield assessment 0046 (1552 KB)
Enclosure 3 - Letter by 4Energia 0046 (357 KB)
Enclosure 4 - Sudenai-Lendimai financial projection (165 KB)
|
| (A)IE chosen by the project participants for determination | TÜV SÜD Industrie Service GmbH |
| Determination report |
Determination report (96 KB)Relevant documents: Determination Report (686 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
18,233 t CO2 equivalent |
| Fee | 0.00 USD |
| Period for requesting review | 30 Jun 09 - 13 Aug 09 (17:00 GMT) |
| Crediting period | 01 Sep 08 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Sudenai and Lendimai Wind Power Joint Implementation Project |

Approval
Enclosure 1 - Sensitivity Analysis 0046