16:44 23 Nov 24
Project
0025 :
Rudaiciai Wind Power Park Project
Reference number | 0025 | |||
---|---|---|---|---|
Title |
Project: Rudaiciai Wind Power Park Project** |
|||
Host Party(ies) |
Lithuania
(project participant: no)
Approval (323 KB) Authorised project participants: Vydmantai wind park, UAB* UAB Veju spektras (withdrawn)* Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (313 KB) Authorised project participants: SIA E kvotas Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (251 KB)* | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
|||
PDD(s) |
PDD (759 KB)
Supporting documentation: Enclosure 1 - Financial calculation tables (Rudaiciai_budget_20years) (95 KB) Enclosure 2 - IRR_calculation_for_cogeneration (kogeneracijos_IRR_skaiciavimas1) (33 KB) Enclosure 3 - IRR for cogeneration plant Panevezys (Panevezys_CHP_cash-flow1) (41 KB) Enclosure 4 - Confirmation by Project Participants and TUEV SUED (267 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | TÜV SÜD Industrie Service GmbH | |||
Determination report |
Determination report (90 KB) Relevant documents: Revised Determination Report (312 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
46,231 t CO2 equivalent | |||
Fee | 7,746.20 USD | |||
Period for requesting review | 13 Jun 08 - 27 Jul 08 (17:00 GMT) | |||
Crediting period | 01 Jan 08 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 005**
Verified emission reductions/enhancements of removals: 31,012 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 43,954 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 34,121 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 35,945 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 44,934 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: