17:00 23 Nov 24
Project
0079 :
CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK
Reference number | 0079 | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Title |
Project: CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK |
||||||||||||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (832 KB) Authorised project participants: DTEK Mine Komsomolets Donbassa, PJSC Authorizations: Authorisation included in the written approval |
||||||||||||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (245 KB) Authorised project participants: Carbon-TF B.V. Authorizations: Authorisation included in the written approval |
||||||||||||
Modalities of communication | Modalities of communication (581 KB) | ||||||||||||
Scale | Large | ||||||||||||
Project category |
Sectoral scope(s): 10: Fugitive emissions from fuels (solid, oil and gas) 8: Mining/mineral production |
||||||||||||
PDD(s) |
PDD (1427 KB)
Supporting documentation: Financial analysis (102 KB) Emission Reduction Kom Don (172 KB) Revisions to the monitoring plan:*
|
||||||||||||
(A)IE chosen by the project participants for determination | DNV Climate Change Services AS | ||||||||||||
Determination report |
Determination report (1057 KB) Relevant documents: DR_Rev (344 KB) |
||||||||||||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
316,941 t CO2 equivalent | ||||||||||||
Fee | 61,888.20 USD | ||||||||||||
Period for requesting review | 25 Oct 08 - 08 Dec 08 (17:00 GMT) | ||||||||||||
Crediting period | 01 Jan 08 - 31 Dec 12 | ||||||||||||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
||||||||||||
Monitoring / verification |
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 137,565 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||||||||||
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 100,060 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||||||||||||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 113,129 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||||||||||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 66,137 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: