12:47 28 Dec 24
0079:
CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK
Reference number | 0079 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Title |
Project:
CMM utilisation on the Joint Stock Company named Komsomolets Donbassa Coal Mine of DTEK |
||||||||||
Host Party(ies) | Ukraine | ||||||||||
Scale | Large | ||||||||||
Project category |
Sectoral scope(s): 10: Fugitive emissions from fuels (solid, oil and gas) 8: Mining/mineral production |
||||||||||
Crediting period | 01 Jan 08 - 31 Dec 12 | ||||||||||
Verification report |
Monitoring report/verification number: 001
Monitoring period: 09 Aug 08 - 03 Nov 09 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Determination regarding the revisions to the monitoring plan(s): Determination (545 KB)
Verified emission reductions/enhancements of removals: 66,137 tonnes CO2 equivalent Period for requesting review: 08 Jun 10 - 22 Jun 10 (17:00 GMT) |
* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."
(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)
Connect with JI: