22:57 27 Dec 24
Project
0236 :
Kreivenai-III wind power park project
Reference number | 0236 |
---|---|
Title |
Project: Kreivenai-III wind power park project** |
Host Party(ies) |
Lithuania
(project participant: no)
Approval (2860 KB) Authorised project participants: UAB "Vejo vatas" Authorizations: Authorisation included in the written approval |
Other Party(ies) involved |
Netherlands
(project participant: no)*
Approval (375 KB) Authorised project participants: Ecocom BG, LTD* Authorizations: Authorisation included in the written approval* |
Modalities of communication | Modalities of communication (1389 KB) |
Scale | Small |
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
PDD(s) | PDD (750 KB) |
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
Determination report |
Determination report (147 KB) Relevant documents: KREIVENAI III_JI_ DETERMINATION REPORT (509 KB) Financial Model Kreivenai III (465 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
25,881 t CO2 equivalent |
Fee | 0.00 USD |
Period for requesting review | 05 Oct 11 - 18 Nov 11 (17:00 GMT) |
Crediting period | 01 Dec 10 - 31 Dec 12 |
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
Monitoring / verification |
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 20,039 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 17,204 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: