19:38 23 Nov 24
0077:
CMM utilisation on the coal mine Shcheglovskaya-Glubokaya of the State Holding Joint-Stock
Reference number | 0077 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Title |
Project:
CMM utilisation on the coal mine Shcheglovskaya-Glubokaya of the State Holding Joint-Stock |
||||||||||
Host Party(ies) | Ukraine | ||||||||||
Scale | Large | ||||||||||
Project category |
Sectoral scope(s): 10: Fugitive emissions from fuels (solid, oil and gas) 8: Mining/mineral production |
||||||||||
Crediting period | 01 Jan 08 - 31 Dec 12 | ||||||||||
Verification report |
Monitoring report/verification number: 003
Monitoring period: 16 Mar 11 - 30 Apr 12 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Determination regarding the revisions to the monitoring plan(s): Determination (360 KB)
Verified emission reductions/enhancements of removals: 129,765 tonnes CO2 equivalent Period for requesting review: 28 Aug 12 - 11 Sep 12 (17:00 GMT) |
* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."
(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)
Connect with JI: