16:51 23 Nov 24
Project
0077 :
CMM utilisation on the coal mine Shcheglovskaya-Glubokaya of the State Holding Joint-Stock
Reference number | 0077 | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Title |
Project: CMM utilisation on the coal mine Shcheglovskaya-Glubokaya of the State Holding Joint-Stock |
|||||||||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (972 KB) Authorised project participants: PJSC "Colliery Group "Donbas"* Authorizations: Authorisation included in the written approval |
|||||||||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (68 KB) Authorised project participants: Carbon-TF B.V. Authorizations: Authorisation included in the written approval |
|||||||||
Modalities of communication | Modalities of communication (3146 KB)* | |||||||||
Scale | Large | |||||||||
Project category |
Sectoral scope(s): 10: Fugitive emissions from fuels (solid, oil and gas) 8: Mining/mineral production |
|||||||||
PDD(s) |
PDD (1341 KB)
Supporting documentation: 77_Financial Esimated (118 KB) 77_Investment Analysis (61 KB) 77_Emissions Reductions (397 KB) 77_Financial Real (130 KB) 77_Declaration of conformity (41 KB) Revisions to the monitoring plan:*
|
|||||||||
(A)IE chosen by the project participants for determination | DNV Climate Change Services AS | |||||||||
Determination report |
Determination report (932 KB) Relevant documents: 77_Determination Report (455 KB) |
|||||||||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
165,348 t CO2 equivalent | |||||||||
Fee | 31,569.60 USD | |||||||||
Period for requesting review | 19 Aug 09 - 02 Oct 09 (17:00 GMT) | |||||||||
Crediting period | 01 Jan 08 - 31 Dec 12 | |||||||||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report Review |
|||||||||
Monitoring / verification |
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 89,505 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||||||||
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 129,765 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||||||||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 67,425 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||||||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 212,191 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: