0077: CMM utilisation on the coal mine Shcheglovskaya-Glubokaya of the State Holding Joint-Stock
 
Reference number 0077
Title Project:
CMM utilisation on the coal mine Shcheglovskaya-Glubokaya of the State Holding Joint-Stock*
Host Party(ies) Ukraine
Scale Large
Project category Sectoral scope(s):
10: Fugitive emissions from fuels (solid, oil and gas)
8: Mining/mineral production
Crediting period 01 Jan 08 - 31 Dec 12
Verification report Monitoring report/verification number: 003

Monitoring period:
16 Mar 11 - 30 Apr 12

AIE that performed the verification:
Bureau Veritas Certification Holding SAS

Revised monitoring plan(s):**
Revised monitoring plan (156 KB)

Determination regarding the revisions to the monitoring plan(s):
Determination (360 KB)

Monitoring report(s): Supporting documentation:
Monitoring report (538 KB) ERUs calculations (58 KB)

Verification report(s): Other relevant documents:
Verification report (42 KB) Verification Report (360 KB)

Verified emission reductions/enhancements of removals:
129,765 tonnes CO2 equivalent

Period for requesting review:
28 Aug 12 - 11 Sep 12 (17:00 GMT)


* Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.

** According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."

(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)