18:56 08 Dec 24
0188:
Slag usage and switch from wet to dry process at Yugcement, Ukraine
Reference number | 0188 | ||||||||
---|---|---|---|---|---|---|---|---|---|
Title |
Project:
Slag usage and switch from wet to dry process at Yugcement, Ukraine |
||||||||
Host Party(ies) | Ukraine | ||||||||
Scale | Large | ||||||||
Project category |
Sectoral scope(s): 4: Manufacturing industries |
||||||||
Crediting period | 01 Jul 08 - 31 Dec 12 | ||||||||
Verification report |
Monitoring report/verification number: 001
Monitoring period: 01 Jan 09 - 31 Mar 11 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Determination regarding the revisions to the monitoring plan(s): Determination (355 KB)
Verified emission reductions/enhancements of removals: 18,123 tonnes CO2 equivalent Period for requesting review: 27 Sep 11 - 11 Oct 11 (17:00 GMT) |
* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."
(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)
Connect with JI: