17:14 23 Nov 24
Project
0188 :
Slag usage and switch from wet to dry process at Yugcement, Ukraine
Reference number | 0188 | |||
---|---|---|---|---|
Title |
Project: Slag usage and switch from wet to dry process at Yugcement, Ukraine** |
|||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (640 KB) Authorised project participants: JSC Yugcement Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Germany
(project participant: no)
Approval (1885 KB) Authorised project participants: Dyckerhoff AG Authorizations: Authorisation included in the written approval Netherlands (project participant: no) Approval (279 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (306 KB) | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 4: Manufacturing industries |
|||
PDD(s) |
PDD (671 KB)
Supporting documentation: Cash Flow Analyses Spreadsheet “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (82 KB) Calculation Spreadsheet “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (68 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS | |||
Determination report |
Determination report (62 KB) Relevant documents: Determination Report “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (1186 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
41,344 t CO2 equivalent | |||
Fee | 6,768.80 USD | |||
Period for requesting review | 03 Nov 10 - 17 Dec 10 (17:00 GMT) | |||
Crediting period | 01 Jul 08 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 18,123 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: