Project 0188 : Slag usage and switch from wet to dry process at Yugcement, Ukraine
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0188
Title Project:
Slag usage and switch from wet to dry process at Yugcement, Ukraine
Host Party(ies) Ukraine (project participant: no)
Approval (640 KB)

Authorised project participants:
JSC Yugcement

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Germany (project participant: no)
Approval (1885 KB)

Authorised project participants:
Dyckerhoff AG

Authorizations:
Authorisation included in the written approval
Netherlands (project participant: no)
Approval (279 KB)

Authorised project participants:
Global Carbon BV

Authorizations:
Authorisation included in the written approval
Scale Large
Project category Sectoral scope(s):
4: Manufacturing industries
PDD(s) PDD (671 KB)

Supporting documentation:
Cash Flow Analyses Spreadsheet “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (82 KB)
Calculation Spreadsheet “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (68 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (62 KB)

Relevant documents:

Determination Report “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (1186 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
41,344 t CO2 equivalent
Fee 6,768.80 USD
Period for requesting review 03 Nov 10 - 17 Dec 10 (17:00 GMT)
Crediting period 01 Jul 08 - 31 Dec 12
Project design document / determination Publication of the project design document
Slag usage and switch from wet to dry process at Yugcement, Ukraine