17:27 27 Dec 24
Project
0188 :
Slag usage and switch from wet to dry process at Yugcement, Ukraine
This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
---|---|
Reference number | 0188 |
Title |
Project: Slag usage and switch from wet to dry process at Yugcement, Ukraine |
Host Party(ies) |
Ukraine
(project participant: no) Approval (640 KB) Authorised project participants: JSC Yugcement Authorizations: Authorisation included in the written approval |
Other Party(ies) involved |
Germany
(project participant: no) Approval (1885 KB) Authorised project participants: Dyckerhoff AG Authorizations: Authorisation included in the written approval Netherlands (project participant: no) Approval (279 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
Scale | Large |
Project category |
Sectoral scope(s): 4: Manufacturing industries |
PDD(s) |
PDD (671 KB)
Supporting documentation: Cash Flow Analyses Spreadsheet “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (82 KB) Calculation Spreadsheet “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (68 KB) |
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
Determination report |
Determination report (62 KB) Relevant documents: Determination Report “Slag usage and switch from wet to dry process at Yugcement, Ukraine” (1186 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
41,344 t CO2 equivalent |
Fee | 6,768.80 USD |
Period for requesting review | 03 Nov 10 - 17 Dec 10 (17:00 GMT) |
Crediting period | 01 Jul 08 - 31 Dec 12 |
Project design document / determination |
Publication of the project design document Slag usage and switch from wet to dry process at Yugcement, Ukraine |
Connect with JI: