Project 0214 : Waste heaps dismantling with the aim of decreasing the greenhouse gases emissions into the atmosphere
 
Reference number 0214
Title Project:
Waste heaps dismantling with the aim of decreasing the greenhouse gases emissions into the atmosphere**

Host Party(ies) Ukraine (project participant: no)
Approval (2059 KB)

Authorised project participants:
Anthracite LLC

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (330 KB)

Authorised project participants:
Global Carbon BV

Authorizations:
Authorisation included in the written approval
Modalities of communication Modalities of communication (249 KB)
Scale Large
Project category Sectoral scope(s):
8: Mining/mineral production
PDD(s) PDD (1792 KB)

Revisions to the monitoring plan:*
23 May 12 Monitoring plan (1210 KB)
Determination (494 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (61 KB)

Relevant documents:

Determination Report No. UKRAINE/0070/2009 – revision 04 (913 KB)
Calculation Spreadsheet (74 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
98,813 t CO2 equivalent
Fee 18,262.60 USD
Period for requesting review 16 Jul 10 - 29 Aug 10 (17:00 GMT)
Crediting period 01 Jan 08 - 31 Dec 12
Project design document / determination
(history)
Publication of the project design document
Publication of the determination report
Monitoring / verification Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 337,608 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 108,714 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 174,411 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification

* Amended after final determination regarding the project design document in accordance with the relevant provisions.

** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.