10:42 27 Nov 24
0214:
Waste heaps dismantling with the aim of decreasing the greenhouse gases emissions into the atmosphere
Reference number | 0214 | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Title |
Project:
Waste heaps dismantling with the aim of decreasing the greenhouse gases emissions into the atmosphere |
||||||||||
Host Party(ies) | Ukraine | ||||||||||
Scale | Large | ||||||||||
Project category |
Sectoral scope(s): 8: Mining/mineral production |
||||||||||
Crediting period | 01 Jan 08 - 31 Dec 12 | ||||||||||
Verification report |
Monitoring report/verification number: 003
Monitoring period: 01 Mar 11 - 29 Feb 12 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Determination regarding the revisions to the monitoring plan(s): Determination (494 KB)
Verified emission reductions/enhancements of removals: 337,608 tonnes CO2 equivalent Period for requesting review: 25 Jul 12 - 08 Aug 12 (17:00 GMT) |
* According to paragraph 37 of the Guidance on criteria for baseline setting and monitoring the "project participants are encouraged to improve the monitoring process and its results. Revisions, if any, to the monitoring plan to improve its accuracy and/or completeness of information shall be justified by project participants and shall be submitted for the determination referred to in paragraph 37 of the JI guidelines by the AIE. In this case the AIE shall determine whether the proposed revisions improve the accuracy and/or completeness of information of the original monitoring plan without changing conformity with the relevant rules and regulations for the establishment of monitoring plans and, in case of a positive determination, shall proceed with the determination referred to in paragraph 37 of the JI guidelines."
(Unless otherwise indicated, the term "JI guidelines" refers to the annex of decision 9/CMP.1.)
Connect with JI: