Project 0105 : CMM utilisation on the Joint Stock Company "Coal Company Krasnoarmeyskaya Zapadnaya No 1 Mine"
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0105
Title Project:
CMM utilisation on the Joint Stock Company “Coal Company Krasnoarmeyskaya Zapadnaya No 1 Mine"
Host Party(ies) Ukraine (project participant: no)
Approval (1214 KB)

Authorised project participants:
Joint Stock Company “Coal Company Krasnoarmeyskaya Zapadnaya № 1 Mine"

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (61 KB)

Authorised project participants:
Carbon-TF B.V.

Authorizations:
Authorisation included in the written approval
Scale Large
Project category Sectoral scope(s):
10: Fugitive emissions from fuels (solid, oil and gas)
8: Mining/mineral production
PDD(s) PDD (1354 KB)
(A)IE chosen by the project participants for determination DNV Climate Change Services AS
Determination report Determination report (1069 KB)

Relevant documents:

105_Determination Report (504 KB)
105_Investment Analysis (160 KB)
105_Avoided CO2 Emissions CMM (111 KB)
105_Emissions Reductions Calc (182 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
1,570,527 t CO2 equivalent
Fee 312,605.40 USD
Period for requesting review 25 Sep 09 - 08 Nov 09 (17:00 GMT)
Crediting period 01 Jan 08 - 31 Dec 12
Project design document / determination Publication of the project design document
CMM utilisation on the Joint Stock Company “Coal Company Krasnoarmeyskaya Zapadnaya № 1 Mine”