10:14 01 Nov 25
Project
0105 :
CMM utilisation on the Joint Stock Company "Coal Company Krasnoarmeyskaya Zapadnaya No 1 Mine"
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0105 |
| Title |
Project: CMM utilisation on the Joint Stock Company “Coal Company Krasnoarmeyskaya Zapadnaya No 1 Mine" |
| Host Party(ies) |
Ukraine
(project participant: no) Approval (1214 KB)Authorised project participants: Joint Stock Company “Coal Company Krasnoarmeyskaya Zapadnaya № 1 Mine" Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Netherlands
(project participant: no) Approval (61 KB)Authorised project participants: Carbon-TF B.V. Authorizations: Authorisation included in the written approval |
| Scale | Large |
| Project category |
Sectoral scope(s): 10: Fugitive emissions from fuels (solid, oil and gas) 8: Mining/mineral production |
| PDD(s) |
PDD (1354 KB)
|
| (A)IE chosen by the project participants for determination | DNV Climate Change Services AS |
| Determination report |
Determination report (1069 KB)Relevant documents: 105_Determination Report (504 KB)
105_Investment Analysis (160 KB)
105_Avoided CO2 Emissions CMM (111 KB)
105_Emissions Reductions Calc (182 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
1,570,527 t CO2 equivalent |
| Fee | 312,605.40 USD |
| Period for requesting review | 25 Sep 09 - 08 Nov 09 (17:00 GMT) |
| Crediting period | 01 Jan 08 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document CMM utilisation on the Joint Stock Company “Coal Company Krasnoarmeyskaya Zapadnaya № 1 Mine” |

Approval
105_Avoided CO2 Emissions CMM
Connect with JI: