18:25 03 Oct 24
Project
0211 :
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”
This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
---|---|
Reference number | 0211 |
Title |
Project: Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant” |
Host Party(ies) |
Ukraine
(project participant: no) Approval (3340 KB) Authorised project participants: Joint Stock Company "ZaporozhCox Plant" Authorizations: Authorisation included in the written approval |
Other Party(ies) involved |
Netherlands
(project participant: no) Approval (423 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
Scale | Large |
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
PDD(s) |
PDD (625 KB)
Supporting documentation: Emission Reductions and Financial Analysis Calculations (275 KB) |
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
Determination report |
Determination report (58 KB) Relevant documents: Determination Report Zaporozhcox (526 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
52,322 t CO2 equivalent |
Fee | 8,964.40 USD |
Period for requesting review | 26 Jun 10 - 09 Aug 10 (17:00 GMT) |
Crediting period | 01 Feb 08 - 31 Dec 12 |
Project design document / determination |
Publication of the project design document Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant” |
Connect with JI: