12:57 28 Oct 25
Project
0211 :
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0211 |
| Title |
Project: Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant” |
| Host Party(ies) |
Ukraine
(project participant: no) Approval (3340 KB)Authorised project participants: Joint Stock Company "ZaporozhCox Plant" Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Netherlands
(project participant: no) Approval (423 KB)Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
| Scale | Large |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
| PDD(s) |
PDD (625 KB)
Supporting documentation: Emission Reductions and Financial Analysis Calculations (275 KB)
|
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
| Determination report |
Determination report (58 KB)Relevant documents: Determination Report Zaporozhcox (526 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
52,322 t CO2 equivalent |
| Fee | 8,964.40 USD |
| Period for requesting review | 26 Jun 10 - 09 Aug 10 (17:00 GMT) |
| Crediting period | 01 Feb 08 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant” |

Approval
Emission Reductions and Financial Analysis Calculations
Connect with JI: