Project 0211 : Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0211
Title Project:
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”
Host Party(ies) Ukraine (project participant: no)
Approval (3340 KB)

Authorised project participants:
Joint Stock Company "ZaporozhCox Plant"

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (423 KB)

Authorised project participants:
Global Carbon BV

Authorizations:
Authorisation included in the written approval
Scale Large
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)
PDD(s) PDD (625 KB)

Supporting documentation:
Emission Reductions and Financial Analysis Calculations (275 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (58 KB)

Relevant documents:

Determination Report Zaporozhcox (526 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
52,322 t CO2 equivalent
Fee 8,964.40 USD
Period for requesting review 26 Jun 10 - 09 Aug 10 (17:00 GMT)
Crediting period 01 Feb 08 - 31 Dec 12
Project design document / determination Publication of the project design document
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”