17:03 23 Nov 24
Project
0211 :
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”
Reference number | 0211 | |||
---|---|---|---|---|
Title |
Project: Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”** |
|||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (3340 KB) Authorised project participants: Joint Stock Company "ZaporozhCox Plant" Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (423 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (431 KB) | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
|||
PDD(s) |
PDD (1129 KB)
Supporting documentation: Emission Reductions and Financial Analysis Calculations (275 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS | |||
Determination report |
Determination report (58 KB) Relevant documents: Determination Report ZaporozhCox (854 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
52,322 t CO2 equivalent | |||
Fee | 8,964.40 USD | |||
Period for requesting review | 26 Jun 10 - 09 Aug 10 (17:00 GMT) | |||
Crediting period | 01 Feb 08 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report Review |
|||
Monitoring / verification |
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 83,437 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 67,598 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 78,583 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: