19:13 19 Nov 25
0211:
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant”
| Reference number | 0211 | ||||||||
|---|---|---|---|---|---|---|---|---|---|
| Title |
Project:
Utilization of coke gas with electricity generation by two 6 MWe CHP at “ZaporozhCox Plant” |
||||||||
| Host Party(ies) | Ukraine | ||||||||
| Scale | Large | ||||||||
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
||||||||
| Crediting period | 01 Feb 08 - 31 Dec 12 | ||||||||
| Verification report |
Monitoring report/verification number: 001
Monitoring period: 01 Feb 08 - 31 Dec 09 AIE that performed the verification: Bureau Veritas Certification Holding SAS
Verified emission reductions/enhancements of removals: 78,583 tonnes CO2 equivalent Period for requesting review: 08 Dec 10 - 22 Dec 10 (17:00 GMT) |

Monitoring report
Calculation of Emission Reductions
Connect with JI: