05:58 03 Nov 25
Project
0195 :
Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0195 |
| Title |
Project: Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia |
| Host Party(ies) |
Russian Federation
(project participant: no) Approval (2754 KB)Authorised project participants: OGK-4 Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Germany
(project participant: no) Approval (712 KB)Authorised project participants: E.ON Carbon Sourcing Authorizations: Authorisation included in the written approval |
| Scale | Large |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
| PDD(s) |
PDD (1094 KB)
|
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
| Determination report |
Determination report (125 KB)Relevant documents: Determination Report No. RUSSIA/0039/2010 v.1 (627 KB)
Cash Flow Calculations – excel file (210 KB)
Emission Reductions Calculations – excel file (70 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
490,837 t CO2 equivalent |
| Fee | 30,000.00 USD |
| Period for requesting review | 31 Aug 10 - 14 Oct 10 (17:00 GMT) |
| Crediting period | 15 Sep 10 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia |

Approval
Cash Flow Calculations – excel file
Connect with JI: