03:32 08 Dec 25
Project
0195 :
Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia
| Reference number | 0195 |
|---|---|
| Title |
Project: Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia** |
| Host Party(ies) |
Russian Federation
(project participant: no)
Approval (2754 KB)Authorised project participants: OGK-4 Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Germany
(project participant: no)
Approval (712 KB)Authorised project participants: E.ON Carbon Sourcing Authorizations: Authorisation included in the written approval |
| Modalities of communication |
Modalities of communication (459 KB)
|
| Scale | Large |
| Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
| PDD(s) |
PDD (1094 KB)
|
| (A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS |
| Determination report |
Determination report (125 KB)Relevant documents: Determination Report No. RUSSIA/0039/2010 v.1 (627 KB)
Cash Flow Calculations – excel file (210 KB)
Emission Reductions Calculations – excel file (70 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
490,837 t CO2 equivalent |
| Fee | 30,000.00 USD |
| Period for requesting review | 31 Aug 10 - 14 Oct 10 (17:00 GMT) |
| Crediting period | 15 Sep 10 - 31 Dec 12 |
|
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
| Monitoring / verification |
Monitoring report/verification number: 001
Publication of monitoring report(s) |
** Paragraph 3 of
Decision 10/CMP.1
stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may
act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ...
shall be valid only after the accreditation of the independent entity is finalized".
All projects with final determinations that have been performed by provisionally acting accredited independent
entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.

Approval
Cash Flow Calculations – excel file
Connect with JI: