01:56 19 Nov 25
Project
0246 :
Processing of waste heaps at Monolith-Ukraine
| This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
|---|---|
| Reference number | 0246 |
| Title |
Project: Processing of waste heaps at Monolith-Ukraine |
| Host Party(ies) |
Ukraine
(project participant: no) Approval (1096 KB)Authorised project participants: Monolith-Ukraine Ltd. Authorizations: Authorisation included in the written approval |
| Other Party(ies) involved |
Netherlands
(project participant: no) Approval (1319 KB)Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
| Scale | Large |
| Project category |
Sectoral scope(s): 8: Mining/mineral production |
| PDD(s) |
PDD (1516 KB)
|
| (A)IE chosen by the project participants for determination | DNV Climate Change Services AS |
| Determination report |
Determination report (1019 KB)Relevant documents: 0246- ER Sheet (79 KB)
0246- CF Sheet (73 KB)
0246- DTR (977 KB)
|
| Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
195,737 t CO2 equivalent |
| Fee | 30,000.00 USD |
| Period for requesting review | 29 Sep 11 - 12 Nov 11 (17:00 GMT) |
| Crediting period | 01 Jan 10 - 31 Dec 12 |
| Project design document / determination |
Publication of the project design document Processing of waste heaps at Monolith-Ukraine |

Approval
0246- ER Sheet
Connect with JI: