20:57 27 Dec 24
Project
0246 :
Processing of waste heaps at Monolith-Ukraine
Reference number | 0246 | |||
---|---|---|---|---|
Title |
Project: Processing of waste heaps at Monolith-Ukraine |
|||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (1096 KB) Authorised project participants: Monolith-Ukraine Ltd. Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (1319 KB) Authorised project participants: Global Carbon BV Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (406 KB) | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 8: Mining/mineral production |
|||
PDD(s) |
PDD (1516 KB)
Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | DNV Climate Change Services AS | |||
Determination report |
Determination report (1019 KB) Relevant documents: 0246- ER Sheet (79 KB) 0246- CF Sheet (73 KB) 0246- DTR (977 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
195,737 t CO2 equivalent | |||
Fee | 30,000.00 USD | |||
Period for requesting review | 29 Sep 11 - 12 Nov 11 (17:00 GMT) | |||
Crediting period | 01 Jan 10 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 219,704 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: