21:04 27 Dec 24
Project
0078 :
CMM utilisation on the Coal Mine № 22 “Kommunarskaya” of the State Holding Joint-Stock Company "GOAO Shakhtoupravlenye Donbass"
Reference number | 0078 | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
Title |
Project: CMM utilisation on the Coal Mine № 22 “Kommunarskaya” of the State Holding Joint-Stock Company "GOAO Shakhtoupravlenye Donbass" |
|||||||||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (981 KB) Authorised project participants: PJSC "Colliery Group "Donbas"* Authorizations: Authorisation included in the written approval |
|||||||||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (62 KB) Authorised project participants: Carbon-TF B.V. Authorizations: Authorisation included in the written approval |
|||||||||
Modalities of communication | Modalities of communication (2463 KB)* | |||||||||
Scale | Large | |||||||||
Project category |
Sectoral scope(s): 8: Mining/mineral production |
|||||||||
PDD(s) |
PDD (1455 KB)
Revisions to the monitoring plan:*
|
|||||||||
(A)IE chosen by the project participants for determination | DNV Climate Change Services AS | |||||||||
Determination report |
Determination report (1107 KB) Relevant documents: 078_Revised estimation of emission reductions for the years 2008-2009 (247 KB) 078_IRR analysis (119 KB) 078_Emission Reductions (417 KB) 0078_Determination report_Komm-22_corrected (592 KB) |
|||||||||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
132,395 t CO2 equivalent | |||||||||
Fee | 24,979.00 USD | |||||||||
Period for requesting review | 10 Nov 09 - 24 Dec 09 (17:00 GMT) | |||||||||
Crediting period | 07 Jul 08 - 31 Dec 12 | |||||||||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||||||||
Monitoring / verification |
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 183,838 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||||||||
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 235,397 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||||||||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 166,441 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||||||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 75,144 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: