Project 0034 : Benaiciai Wind Power Project
 
Reference number 0034
Title Project:
Benaiciai Wind Power Project**

Host Party(ies) Lithuania (project participant: no)
Approval (107 KB)

Authorised project participants:
UAB Renerga

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Sweden (project participant: no)
Approval (62 KB)

Authorised project participants:
Nordic Environment Finance Corporation (NEFCO)

Authorizations:
Authorisation included in the written approval
Modalities of communication Modalities of communication (198 KB)
Scale Large
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)
PDD(s) PDD (567 KB)

Supporting documentation:
Enclosure 1 - Financial calculation tables (Benaiciai_budget_20years_updated) (79 KB)
Enclosure 2 - IRR Benchmark cogeneration plants (kogeneracijos_IRR_skaiciavimas) (24 KB)
Enclosure 3 - IRR Calculation for cogeneration plant (Panevezys_CHP_cash-flow) (41 KB)
Enclosure 4 - Assignment of contract with Hansa Lizingas CERT (615 KB)
Enclosure 5 - Letter from contractor Zilinskio ir Ko CERT (1030 KB)
Enclosure 6 - Letter from Abisala CERT (512 KB)
(A)IE chosen by the project participants for determination TÜV SÜD Industrie Service GmbH
Determination report Determination report (90 KB)

Relevant documents:

Revised Determination Report (1095 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
26,127 t CO2 equivalent
Fee 3,725.40 USD
Period for requesting review 13 Jun 08 - 27 Jul 08 (17:00 GMT)
Crediting period 01 Jan 08 - 31 Dec 12
Project design document / determination
(history)
Publication of the project design document
Publication of the determination report
Monitoring / verification Monitoring report/verification number: 005**
Verified emission reductions/enhancements of removals: 17,438 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 24,759 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 18,178 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 21,381 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 27,250 t CO2 equivalent
Publication of monitoring report(s)
Publication of verification report(s)
Final verification

** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.