21:21 27 Dec 24
Project
0049 :
Lapes Landfill Gas Utilization and Energy Generation
Reference number | 0049 | |||
---|---|---|---|---|
Title |
Project: Lapes Landfill Gas Utilization and Energy Generation** |
|||
Host Party(ies) |
Lithuania
(project participant: no)
Approval (119 KB) Authorised project participants: UAB “Ekoresursai” Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Sweden
(project participant: no)
Approval (361 KB) Authorised project participants: Nordic Environment Finance Corporation NEFCO in its capacity as Fund Manager to the Baltic Sea Region Testing Ground Facility (TGF) Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (174 KB) | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) 13: Waste handling and disposal |
|||
PDD(s) |
PDD (1281 KB)
Supporting documentation: E1 - Corrected Baseline (34 KB) E2 - Lapes_IRR (1062 KB) E3 - LAPES_Ekoresursai_Loan_Letter (30 KB) E4- LAPES_NEFCO_Loan_Letter (48 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | TÜV SÜD Industrie Service GmbH | |||
Determination report |
Determination report (53 KB) Relevant documents: Determination Report1 (521 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
33,857 t CO2 equivalent | |||
Fee | 5,271.40 USD | |||
Period for requesting review | 17 Nov 09 - 31 Dec 09 (17:00 GMT) | |||
Crediting period | 01 Jul 08 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 004**
Verified emission reductions/enhancements of removals: 7,444 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 33,101 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 19,323 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 34,384 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: