12:44 28 Dec 24
Project
0173 :
Mockiai Wind Power Joint Implementation Project
This page shows the determination as submitted by the accredited independent entity. For the final determination click here | |
---|---|
Reference number | 0173 |
Title |
Project: Mockiai Wind Power Joint Implementation Project |
Host Party(ies) |
Lithuania
(project participant: no) Approval (1030 KB) Authorised project participants: UAB Iverneta Authorizations: Authorisation included in the written approval |
Other Party(ies) involved |
Netherlands
(project participant: no) Approval (158 KB) Authorised project participants: Stichting Carbon Finance (SCF) Authorizations: Authorisation included in the written approval |
Scale | Small |
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) SSC type(s) and category(ies): I.D. : Grid connected renewable electricity generation |
PDD(s) |
PDD (354 KB)
Supporting documentation: Enclosure (20 KB) Enclosure 1 (44 KB) Enclosure 2 (167 KB) |
(A)IE chosen by the project participants for determination | TÜV SÜD Industrie Service GmbH |
Determination report |
Determination report (308 KB) Relevant documents: Determination Report (487 KB) |
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
21,710 t CO2 equivalent |
Fee | 0.00 USD |
Period for requesting review | 04 Jun 11 - 18 Jul 11 (17:00 GMT) |
Crediting period | 01 Jan 10 - 31 Dec 12 |
Project design document / determination |
Publication of the project design document Mockiai Wind Power Joint Implementation Project |
Connect with JI: