Project 0144 : Slag usage and switch from wet to semi-dry process at Volyn-Cement, Ukraine
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0144
Title Project:
Slag usage and switch from wet to semi-dry process at Volyn-Cement, Ukraine
Host Party(ies) Ukraine (project participant: no)
Approval (891 KB)

Authorised project participants:
Join Stock Company "Volyn-Cement"

Authorizations:
Authorisation (891 KB)
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (320 KB)

Authorised project participants:
Global Carbon B.V.

Authorizations:
Authorisation (320 KB)
Authorisation included in the written approval
Germany (project participant: no)
Approval (1056 KB)

Authorised project participants:
Dyckerhoff AG

Authorizations:
Authorisation (1056 KB)
Authorisation included in the written approval
Scale Large
Project category Sectoral scope(s):
4: Manufacturing industries
PDD(s) PDD (994 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (152 KB)

Relevant documents:

Determination Report Volyn-Cement v 6 (1907 KB)
Emission Reductions Calculations (95 KB)
Cash Flow Calculations (139 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
135,654 t CO2 equivalent
Fee 25,630.80 USD
Period for requesting review 03 Apr 10 - 17 May 10 (17:00 GMT)
Crediting period 01 Jan 10 - 31 Dec 12
Project design document / determination Publication of the project design document
Slage usage and switch from wet to semi-dry process at Volyn-Cement, Ukraine