Project 0198 : Reconstruction of Units1,2,3 and 4 at Zuyevska Thermal Power Plant.
This page shows the determination as submitted by the accredited independent entity. For the final determination click here
Reference number 0198
Title Project:
Reconstruction of Units1,2,3 and 4 at Zuyevska Thermal Power Plant.
Host Party(ies) Ukraine (project participant: no)
Approval (775 KB)

Authorised project participants:
Skhidenergo

Authorizations:
Authorisation included in the written approval
Other Party(ies) involved Netherlands (project participant: no)
Approval (279 KB)

Authorised project participants:
Global Carbon B.V.

Authorizations:
Authorisation included in the written approval
Scale Large
Project category Sectoral scope(s):
1: Energy industries (renewable/non-renewable sources)
PDD(s) PDD (442 KB)

Supporting documentation:
Calculation Spreadsheet – excel file 20091512_SD01 ER_ver2.3.xls (76 KB)
Calculation Spreadsheet – excel file 20101215_SD02_CF_ver2.7.xls (87 KB)
(A)IE chosen by the project participants for determination Bureau Veritas Certification Holding SAS
Determination report Determination report (146 KB)

Relevant documents:

Determination Report No. UKRAINE/0038/2009 – revision 03 (862 KB)
Emission reductions/enhancements of removals
(annual average in metric tonnes of CO2 equivalent)
201,951 t CO2 equivalent
Fee 30,000.00 USD
Period for requesting review 08 Jan 11 - 21 Feb 11 (17:00 GMT)
Crediting period 30 Dec 08 - 31 Dec 12
Project design document / determination Publication of the project design document
Reconstruction of Units1,2,3 and 4 at Zuyevska Thermal Power Plant.