21:40 27 Dec 24
Project
0198 :
Reconstruction of Units1,2,3 and 4 at Zuyevska Thermal Power Plant.
Reference number | 0198 | |||
---|---|---|---|---|
Title |
Project: Reconstruction of Units1,2,3 and 4 at Zuyevska Thermal Power Plant.** |
|||
Host Party(ies) |
Ukraine
(project participant: no)
Approval (775 KB) Authorised project participants: Skhidenergo Authorizations: Authorisation included in the written approval |
|||
Other Party(ies) involved |
Netherlands
(project participant: no)
Approval (279 KB) Authorised project participants: Global Carbon B.V. Authorizations: Authorisation included in the written approval |
|||
Modalities of communication | Modalities of communication (146 KB) | |||
Scale | Large | |||
Project category |
Sectoral scope(s): 1: Energy industries (renewable/non-renewable sources) |
|||
PDD(s) |
PDD (442 KB)
Supporting documentation: Calculation Spreadsheet – excel file 20091512_SD01 ER_ver2.3.xls (76 KB) Calculation Spreadsheet – excel file 20101215_SD02_CF_ver2.7.xls (87 KB) Revisions to the monitoring plan:*
|
|||
(A)IE chosen by the project participants for determination | Bureau Veritas Certification Holding SAS | |||
Determination report |
Determination report (146 KB) Relevant documents: Determination Report No. UKRAINE/0038/2009 – revision 03 (862 KB) |
|||
Emission reductions/enhancements of removals (annual average in metric tonnes of CO2 equivalent) |
201,951 t CO2 equivalent | |||
Fee | 30,000.00 USD | |||
Period for requesting review | 08 Jan 11 - 21 Feb 11 (17:00 GMT) | |||
Crediting period | 30 Dec 08 - 31 Dec 12 | |||
Project design document / determination (history) |
Publication of the project design document
Publication of the determination report |
|||
Monitoring / verification |
Monitoring report/verification number: 003**
Verified emission reductions/enhancements of removals: 126,649 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
|||
Monitoring report/verification number: 002**
Verified emission reductions/enhancements of removals: 189,769 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
||||
Monitoring report/verification number: 001**
Verified emission reductions/enhancements of removals: 97,297 t CO2 equivalent Publication of monitoring report(s) Publication of verification report(s) Final verification |
* Amended after final determination regarding the project design document in accordance with the relevant provisions.
** Paragraph 3 of Decision 10/CMP.1 stipulates that, under certain conditions, designated operational entities under the clean development mechanism "may act provisionally as accredited independent entities ... The determinations and relevant activities undertaken ... shall be valid only after the accreditation of the independent entity is finalized". All projects with final determinations that have been performed by provisionally acting accredited independent entities which have not yet been accredited for the relevant function and sectoral scope(s) are marked accordingly.
Connect with JI: