National guidelines and procedures for approving JI projects:
National guidelines and procedures for approving JI projects_English (2309 KB)
National guidelines and procedures for approving JI projects_Russian (2594 KB)

JI projects
Publicly accessible user interface of national registry (if available)*
"Track 2" projects**
RU2000022 0195. Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia
RU2000050 0311. Bikin Tiger Carbon Project - Permanent protection of otherwise logged Bikin Forest, in Primorye Russia
"Track 1" projects**
ITL project ID Title Last Updated
In progress The implementation of the combined-cycle plant at Novgorod heat and power station OJSC “TGC-2”, Russia 28 Jun 12
In progress Fuel switch at Yuzhno-Sakhalinsk Combined Heat and Power Plant (CHPP-1) 15 Nov 12
In progress Energy Efficiency Improvement Measures through modernization of cast-iron production at OJSC Tulachermet, Tula, Russia 10 Jul 12
In progress Realization of a complex of energy saving activities at the OJSC "Kazanorgsintez" 08 Nov 12
RU1000200 Yety-Purovskoe Oil field Associated gas recovery and Utilization project 15 Dec 10
RU1000201 Co-destruction of HFC23 and SF6 at KCKK Polimer plant 17 Dec 10
RU1000202 HFC-23 destruction at JSC, Halogen, Perm 17 Dec 10
RU1000227 Evaporation System Modernization at OJSC “Ilim Group” Branch in Koryazhma 07 Mar 11
RU1000228 Implementation of arc-furnace steelmaking at Magnitogorsk Iron and Steel Works 10 Oct 11
RU1000229 Associated Petroleum Gas Recovery for the Kharampur oil fields of “Rosneft” 09 Mar 11
RU1000230 Associated Gas Recovery Project for the Komsomolskoye Oil Field 31 Jul 13
RU1000231 Reduction of perfluorocarbons emissions from RUSAL Krasnoyarsk Aluminium Smelter 07 Oct 11
RU1000232 Installation of CCGT-400 at Shaturskaya TPP, OGK-4, Moscow area, Russia, Track 1 10 Mar 11
RU1000233 Biomass wastes to energy at OJSC “Ilim Group” Branch in the town of Bratsk 10 Mar 11
RU1000237 Landfill gas recovery and flaring at the municipal solid waste site “Shirokorechenskiy”, Ekaterinburg, Russian Federation 17 Mar 11
RU1000238 Reconstruction of the steelmaking at JSC “Ashinskiy Metallurgical Works”, Asha, Russian Federation 17 Mar 11
RU1000239 SNG gas gathering 17 Mar 11
RU1000240 Upgrading of technological tube furnaces at the company “LUKOIL-Permnefteorgsintez” LLC, city of Perm, Russian Federation 17 Mar 11
RU1000261 Coal- to-Waste Wood Energy Switch in Town of Onega 29 Apr 11
RU1000263 “Implementation of energy efficiency projects at OJSC “Novolipetsk Steel”, Lipetsk area, Russia” 30 May 11
RU1000268 Biomass utilization at JSC Segezha Pulp and Paper Mill 30 May 11
RU1000270 Wood waste to energy in Severoonezhsk, the Arkhangelsk Region 30 May 11
RU1000276 Utilization of associated petroleum gas (APG) at the Serginskoye oil field 30 Nov 11
RU1000277 Utilization of Associated petroleum gas (APG) at the Vostochno-Perevalnoye oil field 30 Nov 11
RU1000278 Utilization of associated petroleum gas (APG) at the Sredne-Khulymsk oil field 30 Nov 11
RU1000281 Modernization of Steel Production at Seversky Pipe Plant, Sverdlovsk Region, Russia 29 Apr 11
RU1000282 Implementation of resource-saving technologies at JSC “Ural Steel”, Novotroitsk, Russia 24 Jun 11
RU1000300 Reconstruction of the OJSC “Nizhniy Tagil Iron and Steel Works” blast furnaces #5 and #6 30 May 11
RU1000302 Utilisation of CMM on coal mines of OAO “SUEK-Kuzbass” 26 Oct 11
RU1000304 Yuzhno Balyksky associated gas recovery project 16 Dec 11
RU1000306 Increase in efficiency of water resources use at Bratsk HPP, Irkutsk region, Russian Federation 18 Jan 12
RU1000309 SF6 destruction at JSC “HaloPolymer Perm” 22 Mar 12
RU1000310 Construction of gas turbine power plants for utilization of associated petroleum gas at thirteen oilfields developed by OJSC “Surgutneftegas” in Khanty-Mansiysk Autonomous Okrug, Russian Federation 06 Mar 12
RU1000311 Construction and implementation of the Casting and Rolling Complex for the production of hot rolled flat products in the Vyksa District, the Nizhny Novgorod Region, the Russian Federation 29 Mar 12
RU1000318 The implementation of energy efficiency measures at Chelyabinsk Electrometallurgical Works, OJSC 03 Apr 12
RU1000319 Associated petroleum gas recovery at Priobskoe oil field of Rosneft 03 Apr 12
RU1000322 Fuel switch at the Arkhangelskaya and Severodvinskaya combined heat-and-power plants of the JSC Territorial Generation Company # 2, Russian Federation 30 Mar 12
RU1000323 The utilization of associated petroleum gas (APG) of the Sugmut oilfield JSC “Gazpromneft - Noyabrskneftegaz” taking into account the effective use of APG of the Romanovo oilfield 27 Mar 12
RU1000324 The utilization of associated petroleum gas of the Yarayner oilfield of JSC “Gazpromneft-Noyabrskneftegaz” 27 Mar 12
RU1000325 Associated petroleum gas flaring reduction and electricity generation at the Khasyrey oil field 20 Apr 12
RU1000332 Finger Shaft Furnace construction at OJSC Severstal, Cherepovets, Vologda region, Russian Federation 15 May 12
RU1000333 Energy efficiency interventions at OJSC Mordovcement Komsomolskiy town, Republic of Mordovia, Russian Federation 15 May 12
RU1000334 Implementation of modern technologies of sinter production and blast furnaces charging at OJSC MMK 26 Mar 12
RU1000335 Production of continuously casted slab steel billet by arc-furnace technique at OJSC MMK 26 Mar 12
RU1000336 Modernization of OJSC “Solombala PPM” energy-generating facilities to reduce fossil fuel consumption, Arkhangelsk, Russian Federation» 20 Apr 12
RU1000338 Technical re-equipment of Tyumen‘ CHPP-1 with putting into operation of a combined-cycle gas plant 14 Mar 12
RU1000339 Energy Efficiency Improvement in Revamping of Steel Production at Severstal JSC, Cherepovets, Russia. Iron production expanding. 05 Jun 12
RU1000340 Installation of three gas turbines SGT-800 type at GTES “Kolomenskoe”, Moscow, Russian Federation (ex. Installation of three combined cycle gas turbine SGT-800 at GTES “Kolomenskoe”, Moscow, Russian Federation.) 06 Jun 12
RU1000343 Utilization of associated petroleum gas from the Verkhnekamsk oil fields, «Permneftegazpererabotka» LLC, Perm, Russian Federation 03 May 12
RU1000344 Reconstruction of Pervomayskaia CHP -14 with installation of combined cycle units 26 Apr 12
RU1000345 Enhancement of Yuzhnaia CHP – 22 of St-Petersburg. Construction of unit #4 26 Apr 12
RU1000347 Construction of electric arc furnace shop with open heart furnace production decommissioning at OJSC “NSMMZ”, Revda, Russia 06 Jun 12
RU1000349 Production modernisation at JSC Amurmetal, Komsomolsk-on-Amur, Khabarovsk Krai, Russian Federation 15 May 12
RU1000351 Reduction of PFC emissions at Irkutsk aluminium smelter 28 Jun 12
RU1000352 Reduction of PFC emissions at RUSAL Bratsk aluminium smelter 28 Jun 12
RU1000353 Utilization of associated petroleum gas at the fields of Companies of TNK-BP Group, Western Siberia 28 Jun 12
RU1000354 Gathering of associated petroleum gas at Khokhryakovskoye field 28 Jun 12
RU1000355 Reduction of PFC emissions at RUSAL Sayanogorsk aluminium smelter 28 Jun 12
RU1000356 Energy Efficiency measures at OJSC “Metallurgical plant named after A.K. Serov” UMMC Company 27 Jun 12
RU1000357 Reduction of PFC emissions at RUSAL Novokuznetsk aluminium smelter 28 Jun 12
RU1000358 «Installation of a multi-fuel boiler at CJSC “International Paper” (former Svetogorsk PPM) for waste biomass utilization and energy generation for own needs, Svetogorsk, Russia» 14 Jun 12
RU1000359 Bark and wood wastes to heat at OJSC “Solombala Sawmill and Woodworking Plant”, Arkhangelsk, Russian Federation 28 Jun 12
RU1000361 Energy efficiency improvement under reconstruction of Oxygen shop and steel continuous casting section of Blast Oxygen Furnace shop #2 at OJSC “Novolipetsk Steel” 10 Jul 12
RU1000364 New dry cement line installation at OJSC “ Sukholozhskcement”, Sverdlovsk area, Russia 10 Jul 12
RU1000366 «Waste Biomass Utilization at JSC Arkhangelsk Pulp and Paper Mill (APPM), Arkhangelsk region, Russia» 28 Jun 12
RU1000367 Implementation of steam-gas turbine units at the CHP of JSC “Mosenergo”, Russia 28 Jun 12
RU1000370 Reconstruction of the metallurgical plant at the Chelyabinsk Metallurgical Plant ОАО, Chelyabinsk, Russia 28 Jun 12
RU1000371 Reconstruction of the steelmaking plant at the Izhstal OAO, Izhevsk, Russia 28 Jun 12
RU1000372 Technical re-equipment of Chelyabinsk СНPP-3 with putting into operation of a combined-cycle gas plant 14 Jun 12
RU1000373 Building of two new combined gas and steam turbine units on Nyagan TPP 14 Jun 12
RU1000374 Retrofitting of Khabarovsk Power Plant 10 Jul 12
RU1000382 Reconstruction of the Nevsky branch Hydro Power Plants 06 Apr 12
RU1000383 Heating mains losses decline in settlements of Tuva Republic, Russian Federation 30 Aug 12
RU1000387 Installation of two CCGT-400 at Surgutskaya TPP-2, OGK-4, Tyumen area, Russia 22 Aug 12
RU1000390 Switch from wet to dry process at OJSC “Shchurovsky Cement”, Russia 04 Sep 12
RU1000394 Installation of new CCGT-400 at Yaivinskaya TPP, OGK-4, Perm area, Russia 22 Aug 12
RU1000395 Utilization of associated petroleum gas at the fields of Companies of TNK-BP Group, Orenburg oblast 30 Aug 12
RU1000397 Blast Furnace reconstruction at OJSC KMZ, Tula, Tula Region, Russian Federation 05 Jun 12
RU1000398 Associated petroleum gas utilization at the Urengoy oil-gas condensate field, Russian Federation 22 Aug 12
RU1000409 Wood waste-to-energy project at Sawmill-25 29 Apr 11
RU1000410 Implementation of 800 MW power generating unit No.2 at Nizhnevartovskaya GRES 02 Oct 12
RU1000412 Expansion of Krasnodar CHPP with installation of CCP-410, LLC “LUKOIL-Kubanenergo”,Russian Federation 02 Oct 12
RU1000413 Introduction of energy-saving measures with utilization of biomass for production of energy resources at the business units of LLC “MEZ Yug Rusi” 09 Jul 12
RU1000431 Construction of gas piston power plants for utilization of associated petroleum gas at oilfields developed by OJSC “Surgutneftegas” in Khanty-Mansiysk Autonomous Okrug 19 Oct 12
RU1000432 Reconstruction of Astrakhan TPP through construction of CCP-110, LLC “LUKOIL-Astrakhanenergo”, Russian Federation 02 Oct 12
RU1000434 Efficient utilization of associated petroleum gas at Salym oilfields, Tumen oblast, Russian Federation 30 Aug 12
RU1000449 Installation of CCGT unit at the Dzerzhinskaya HPS, Russian Federation 28 Jun 12
RU1000451 Construction of new energy unit at Novosibirsk HPS 5 16 Aug 12
RU1000455 Utilization of associated petroleum gas on Talakan oil and gas condensate field, Russian Federation 08 Nov 12
RU1000462 Pellet Production from Sawmill Wastes at CJSC ―Sawmill 25‖, Arkhangelsk, the Russian Federation 07 Nov 12
RU1000471 Waste Coke Oven Gas Utilization at OOO PO “Khimprom” 03 Sep 12
RU1000484 Construction of new Air Separation Plant by Air Liquide Severstal, Russia 28 Nov 12
RU1000487 Carbon sequestration via afforestation in Siberian settlements, Russian Federation 10 Jul 12
RU1000488 Increase in efficiency of heating supply system of Novo-Lenino district, the Irkutsk city, Irkutsk region, Russian Federation 07 Dec 12
RU1000496 GHG emission reduction through the commissioning of biogas-fuelled mini- HPPs at the Kurianovo and Lyubertsy waste water treatment facilities of the MGUP Mosvodokanal 27 Nov 12
RU1000498 Associated petroleum gas treatment for further use at Yuzhno-Khylchuyuskoe field of LLC “Naryanmarneftegas”, Russian Federation 07 Nov 12

* According to paragraph 44 of Decision 13/CMP.1 "each national registry shall make non-confidential information publicly available and provide a publicly accessible user interface through the Internet that allows interested persons to query and view it." In accordance with paragraph 46 of Decision 13/CMP.1 the "information referred to in paragraph 44 ... shall include the following Article 6 project information, for each project identifier against which the Party has issued ERUs: (a) Project name: a unique name for the project(;) (b) Project location: the Party and town or region in which the project is located(;) (c) Years of ERU issuance: the years in which ERUs have been issued as a result of the Article 6 project(;) (d) Reports: downloadable electronic versions of all publicly available documentation relating to the project, including proposals, monitoring, verification and issuance of ERUs, where relevant, subject to the confidentiality provisions in decision 9/CMP.1."

** Projects switching "Tracks" appear with different ITL project IDs.

(The term "Article" refers to an Article of the Kyoto Protocol.)